● Introduction to Concrete Mixer Trucks
>> How Concrete Mixer Trucks Work
● Factors Influencing Concrete's Stay Time in Mixer Trucks
>> Temperature
>> Admixtures
● Standard Time Limits for Concrete in Mixer Trucks
>> Exceptions and Special Cases
>> Techniques to Control Concrete Setting Time
● Transportation of Concrete Mixer Trucks
● Operation Guidelines for Concrete Mixer Trucks
● Impact of Weather on Concrete Pouring
● Strategies for Managing Weather Conditions
● Advanced Technologies in Concrete Mixing
>> Benefits of Advanced Mixing Technologies
● FAQ
>> 1. What is the standard time limit for concrete to be discharged from a mixer truck?
>> 2. How does temperature affect the setting time of concrete?
>> 3. What are admixtures, and how do they affect concrete?
>> 4. Can concrete stay in a mixer truck for more than two hours?
>> 5. How do recent updates to ASTM C94-21 affect the time limit for concrete discharge?
Concrete mixer trucks are essential in the construction industry, serving as mobile blenders that keep concrete in a workable state during transportation. The duration that concrete can remain in a mixer truck is influenced by several factors, including temperature, the type of concrete mix, and the use of admixtures. In this article, we will explore these factors and discuss how they impact the time concrete can stay in a mixer truck.
.
Concrete mixer trucks are designed to mix and transport concrete to construction sites. They consist of a large drum with blades that continuously rotate to keep the concrete in motion, preventing it from setting prematurely. This feature allows the concrete to be delivered in a workable state, ready for immediate use.
The drum inside a concrete mixer truck is constantly in motion during transit. This rotational movement serves a critical purpose: it keeps the concrete mixture in a liquid state, preventing it from hardening prematurely. The blades strategically placed inside the drum ensure thorough mixing of the cement, water, and aggregates, maintaining the ideal consistency of the concrete mixture.
Several factors determine how long concrete can stay in a mixer truck without setting. These include temperature, the type of concrete mix, and the use of admixtures.
Temperature plays a significant role in the setting time of concrete. According to the American Concrete Institute (ACI), the time limit for mixing concrete without it curing is as follows:
- Under 80°F (27°C): 1 hour and 30 minutes
- Between 80°F and 90°F (27°C to 32°C): 1 hour
- Over 90°F (32°C): 45 minutes
Different types of concrete mixes have varying setting times. For example, high-performance concrete, often used in bridge construction, requires quicker discharge compared to lower-strength mixes like those used for fillings.
Admixtures are chemical additives that can extend the workability of concrete. They can delay the setting time, allowing concrete to remain in a mixer truck for longer periods without losing its usability.
In addition to temperature, humidity and wind also impact the setting time of concrete. High humidity can slow down the evaporation of water from the concrete mix, prolonging the setting time. Conversely, low humidity can lead to rapid water loss and quicker setting times. Wind can accelerate the evaporation of water from the concrete surface, further speeding up the setting process.
Traditionally, the standard time limit for concrete to be discharged from a mixer truck is 90 minutes after mixing begins. However, recent updates to ASTM C94-21 allow for more flexibility, enabling the purchaser or producer to specify a time limit based on project requirements.
In some cases, especially for remote projects, exceptions can be made to extend the time limit. The use of set retarders or specialized equipment like self-loading mixers can facilitate longer transportation times.
For instance, in remote areas where access is limited, self-loading mixers can produce fresh concrete on-site, eliminating the need for long-distance transportation. This approach not only extends the usable time of the concrete but also ensures that it meets the required specifications without the risk of premature setting.
Controlling concrete setting time involves a combination of mix design, environmental adjustments, and the use of admixtures. Here are some techniques to manage setting time effectively:
1. Adjusting Mix Proportions: Modifying the water-cement ratio and using different types of cement can help in controlling the setting time. For instance, reducing the water-cement ratio and using rapid-hardening cement can accelerate the setting time.
2. Using Admixtures: Admixtures such as accelerators and retarders are commonly used to control setting time. Accelerators speed up the setting process, while retarders slow it down. The choice of admixture depends on the specific requirements of the project and environmental conditions.
3. Environmental Adjustments: Adjusting environmental conditions, such as using chilled water or ice to cool the concrete, can also extend its workable time. This is particularly useful in hot weather conditions where concrete tends to set too quickly.
Transporting a cement mixer truck requires careful planning and execution due to its size, weight, and the nature of its cargo. Here are the steps involved in transporting a cement mixer truck:
1. Preparation: Before shipping, ensure that all loose components are tightened, and any leftover cement is removed from the mixer. It is also important to remove batteries and battery-powered parts to prevent damage during transport.
2. Route Planning: Plan the transportation route carefully, taking into account the size of the cement mixer truck, any height restrictions, and weight limits on roads and bridges. Obtain any required permits for oversize or overweight vehicles.
3. Securing the Load: Use specialized equipment such as heavy-duty straps, chains, and binders to secure the cement mixer truck to the transport trailer. Ensure that the truck is properly balanced and that the load is distributed evenly to prevent tipping during transportation.
During operation, it is crucial to follow specific guidelines to ensure the quality and safety of the concrete:
1. Pre-check of the Vehicle: Before delivering and mixing concrete, ensure sufficient levels of fuel, lubricating oil, hydraulic oil, brake fluid, and cooling water. The quality of these fluids must meet the required standards.
2. Startup Procedure: Before starting the mixer truck, place the drum operation handle in the “stop” position. Once the engine starts, allow the drum to rotate at a low speed for about 6 minutes to raise the hydraulic oil temperature to above 20°C before operation.
3. Loading Process: Set the control lever to the “loading” position and adjust the drum speed to ensure smooth loading. Reverse the drum before loading to remove any accumulated water and debris to ensure the quality of the concrete.
4. During Transportation: Ensure the chute is securely placed to prevent it from swinging, which could harm pedestrians or affect other vehicles. The mixing drum speed should be between 2-10 RPM to prevent segregation and maintain quality.
Weather conditions significantly affect the pouring and curing process of concrete. Here are some ways in which different weather conditions can impact concrete pouring:
- Temperature: High temperatures accelerate the hydration process, causing concrete to set faster. This can lead to insufficient time for proper placement and finishing, potentially weakening the concrete. Conversely, low temperatures slow down the curing process, which can delay construction schedules and increase the risk of freeze-thaw damage.
- Humidity: Humidity levels also impact concrete setting time. High humidity can slow down the evaporation of water from the concrete mix, prolonging the setting time. Low humidity, on the other hand, can lead to rapid water loss and quicker setting times, increasing the risk of shrinkage cracks.
- Rain: Rainfall during the concrete pouring process can introduce excess water into the mix, potentially weakening the concrete. It can also create surface imperfections and wash away the cement paste, which is crucial for the strength and durability of the concrete.
- Wind: Strong winds can accelerate the evaporation of moisture from the concrete surface, leading to drying and cracking. Wind can also cause surface irregularities by displacing the concrete mix, affecting its finish and overall quality.
To mitigate the impact of adverse weather conditions, various strategies can be employed:
1. Temperature Control: Use insulation blankets or heated enclosures in colder conditions to maintain the concrete's warmth. During hot weather, consider using water sprays or wet burlap coverings to reduce evaporation and prevent the concrete from overheating.
2. Humidity Management: In high humidity conditions, ensure that the concrete is protected from excessive moisture. In low humidity, use misting systems to maintain optimal moisture levels.
3. Rain Protection: Cover fresh concrete immediately after pouring to protect it from rain. Use waterproof covers or tarpaulins to prevent water from entering the mix.
4. Wind Protection: Install windbreaks around the construction site to reduce wind impact. This helps maintain a stable environment for concrete curing.
Recent advancements in concrete mixing technology have significantly improved the efficiency and flexibility of concrete production. Here are some of the key developments:
1. Self-Loading Mixers: These mixers can produce concrete on-site, allowing for greater control over the mixing process and reducing the need for long-distance transportation. They are particularly useful in remote areas where access to ready-mix plants is limited.
2. Automated Mixing Systems: Automated systems can optimize the mixing process by accurately measuring ingredients and controlling the mixing time. This ensures consistent quality and reduces waste.
3. Smart Admixtures: New generations of admixtures can be tailored to specific environmental conditions, providing better control over setting times and improving the durability of the concrete.
The integration of advanced mixing technologies offers several benefits:
- Improved Efficiency: Automated systems streamline the mixing process, reducing labor costs and increasing productivity.
- Enhanced Quality: Consistent mixing conditions ensure that the concrete meets the required specifications, improving its strength and durability.
- Environmental Benefits: By optimizing the mix design and reducing waste, these technologies contribute to more sustainable construction practices.
The duration that concrete can stay in a mixer truck is influenced by temperature, the type of concrete mix, and the use of admixtures. While traditional guidelines suggest a 90-minute limit, advancements in technology and the use of admixtures can extend this time significantly. Understanding these factors is crucial for ensuring the quality and workability of concrete during transportation.
The traditional standard time limit is 90 minutes after mixing begins, but this can vary based on project specifications and the use of admixtures.
Temperature significantly impacts the setting time of concrete. Higher temperatures reduce the time available before the concrete sets, while lower temperatures extend this time.
Admixtures are chemical additives that can modify the properties of concrete, such as extending its workability time or improving its strength. They are commonly used to delay the setting time of concrete.
While it is generally advised not to keep concrete in a mixer truck for more than two hours, exceptions can be made with the use of set retarders or specialized equipment.
Recent updates to ASTM C94-21 allow for more flexibility in specifying the time limit for concrete discharge, enabling it to be determined by the purchaser or producer based on specific project needs.
[1] https://www.epconcretebatchingplant.com/info/how-long-can-concrete-stay-in-a-concrete-mixer-102758011.html
[2] https://aimixmachine.hashnode.dev/transporting-a-self-loading-concrete-mixer-methods-and-considerations
[3] https://www.linkedin.com/pulse/how-weather-impacts-concrete-pouring-chester-inc-
[4] https://www.tob-machinery.com/info/how-long-can-concrete-stay-in-a-concrete-mixer-86406866.html
[5] https://cementconcrete.org/cement-concrete/transport-of-cement-mixer-truck/4110/
[6] https://www.410concrete.com/the-impact-of-weather-on-concrete-quality
[7] https://www.customconcrete.co.uk/how-long-is-concrete-workable/
[8] https://www.keflatwork.com/blog/the-impact-of-weather-on-concrete-paving-repair-and-maintenance/
[9] https://solutions-for-machinery.mypagecloud.com/blog/navigating-the-roads-best-practices-for-self-loading-concrete-mixer-trucks
[10] https://www.reddit.com/r/Concrete/comments/17b6g3o/concrete_trucks_how_long_can_they_mix_the/
[11] https://rmsconcrete.co.uk/best-practices-for-loading-and-unloading-ready-mix-concrete-mixer-trucks/
[12] https://norwegianscitechnews.com/2021/11/the-benefits-of-keeping-concrete-warm-during-transport-in-arctic-conditions/
[13] https://www.concrete.org/frequentlyaskedquestions.aspx?faqid=770
[14] https://whiparound.com/7-concrete-mixer-truck-maintenance-tips-for-your-fleet/
[15] https://ohorongo-cement.com/resources/impact-of-weather-conditions-on-concreting/
[16] https://www.honcha.com/How-long-can-concrete-stay-in-a-mixer-truck
[17] https://bestsupportunderground.com/concrete-transport-with-truck-mixers/?lang=en
[18] https://www.sintef.no/en/latest-news/2021/the-benefits-of-keeping-concrete-warm-during-transport-in-arctic-conditions/
[19] https://www.apollocarmix.com/articles/the-concrete-mixer-truck-essential-equipment-for-efficient-concrete-transport-and-mixing
[20] https://www.linkedin.com/pulse/safety-operation-rules-concrete-mixer-truck-chris-zhang